
Galleon Gold Starts Underground Development at West Cache, Advancing the 86,500-Tonne Bulk Sample Program
Newsfile Corp
Published: Sep 21, 2026, 08:15 PM GMT+9
Sentiment Analysis
Galleon Gold Corp. is pleased to announce that it has commenced underground development at its 100%-owned West Cache Gold Project in Timmins, Ontario. This marks a key milestone in the Company's strategy to de-risk West Cache and advance its planned 86,500-tonne bulk sample program. The box cut and portal ground support are complete, and ramp development has begun, advancing toward the first of four planned bulk sample stopes in Zone #9. Recent drilling has confirmed grade continuity below the planned extraction areas.
"West Cache has moved from permitting to surface construction to underground development inside a single year, and every step has been delivered on plan," said David Russell, Chairman and CEO of Galleon Gold. "Our objective remains clear: to develop the Project, extract the 86,500-tonne bulk sample, and gather the engineering, geological, and operational information required to support future mine development. Doing that safely, and with our community partners alongside us, is how we intend to build this mine."
Galleon Gold will provide further updates as development advances, including ramping, the start of stope extraction, and the processing arrangements for the 86,500-tonne bulk sample. Safety, environmental stewardship, and operational excellence remain the Company's first priorities on site.
The technical content of this news release has been reviewed and approved by David Young, PE, an independent mining engineer and Qualified Person (QP) as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.
The West Cache Gold Project is an advanced-stage gold exploration project covering approximately 11,600 ha located 13 km west of Timmins, Ontario on Provincial Highway 101. It is situated in the Western Porcupine Gold Camp along the Destor-Porcupine Fault Zone within the Abitibi greenstone belt, approximately 7 km northeast of Pan American Silver's Timmins West Mine. The mining lease area hosts the current Mineral Resource Estimate near the center, with additional exploration targets to the north and south. The Mineral Resource Estimate is contained within the Porcupine Sedimentary Basin, a favourable litho-structural corridor with over 5 km of strike-length on the Property. Mineralization is open in all directions and at depth.
Through a disciplined, phased development strategy, Galleon Gold is advancing the West Cache Gold Project by expanding the resource and progressing an 86,500-tonne bulk sample program designed to de-risk and systematically advance West Cache through the next stage of development.
Source: Newsfile Corp
This content is not intended as investment advice or a recommendation. Any opinions expressed are solely the personal views of each article.