
LAURION Reports Multiple Gold and Polymetallic Intercepts, Including 3.75 m Grading 0.568 g/t Au, 12.40 g/t Ag, 0.46% Cu and 1.75% Zn and 0.50 m Grading 3.220 g/t Au and 6.29% Zn at Ishkōday
TheNewswire
公開日時: Sep 14, 2026, 01:15 PM
Sentiment Analysis
LAURION Reports Multiple Gold and Polymetallic Intercepts, Including 3.75 m Grading 0.568 g/t Au, 12.40 g/t Ag, 0.46% Cu and 1.75% Zn and 0.50 m Grading 3.220 g/t Au and 6.29% Zn at Ishkōday
Highlights Include:
LBX26-106: 3.75 m grading 0.568 g/t Au, 12.40 g/t Ag, 0.46% Cu and 1.75% Zn (278.75 m to 282.50 m), including: 2.30 m grading 0.886 g/t Au, 19.26 g/t Ag, 0.73% Cu and 1.64% Zn (280.2 m to 282.5 m); and 0.50 m grading 1.730 g/t Au, 43.20 g/t Ag, 1.51% Cu and 3.40% Zn (282.0 m to 282.5 m).
4.70 m grading 0.582 g/t Au, 2.53 g/t Ag, 0.07% Cu and 0.93% Zn (172.50 m to 176.50 m).
2.70 m grading 0.742 g/t Au, 3.88 g/t Ag, 0.10% Cu and 1.58% Zn (174.50 m to 177.20 m), including: 0.50 m grading 3.220 g/t Au, 9.70 g/t Ag, 0.30% Cu and 6.29% Zn (174.50 m to 175.00 m).
LBX26-107: 1.15 m grading 1.374 g/t Au, 10.10 g/t Ag, 0.49% Cu and 2.01% Zn (239.80 m to 240.95 m), including: 0.50 m grading 1.170 g/t Au, 20.10 g/t Ag, 1.03% Cu and 3.64% Zn (240.45 m to 240.95 m).
2.90 m grading 0.608 g/t Au, 11.93 g/t Ag, 0.34% Cu and 0.93% Zn (351.40 m to 354.30 m), including: 0.80 m grading 1.975 g/t Au, 39.50 g/t Ag, 1.45% Cu and 2.72% Zn (353.50 m to 354.30 m).
TORONTO, Ontario — September 14, 2026 - TheNewswire — LAURION Mineral Exploration Inc. (TSX-V: LME | OTC: LMEFF | FSE: 5YD) (“LAURION” or the “Company”) is pleased to report assay results from drill holes LBX26-106 and LBX26-107 from its ongoing 2026 Phase 1 diamond drilling program at its 100%-owned Ishkōday Gold and Polymetallic Project (“Ishkōday”), located approximately 220 km northeast of Thunder Bay and 28 km northeast of Beardmore, Northwestern Ontario.
Phase 1 Drill Program and Progress Through targeted infill, expansion and exploration drilling, LAURION’s 2026 Phase 1 drill program is designed to systematically advance the A-Zone, which may support the evaluation of a potential maiden Mineral Resource Estimate (“MRE”). Drill holes LBX26-106 and LBX26-107 were designed to test the A-Zone and McLeod mineralized systems at depth and along strike, tighten drill spacing, and evaluate priority geophysical targets. Together, the drilling is providing additional information regarding the geometry and potential extent of mineralization, and is being evaluated to assess continuity within the mineralized system.
LBX26-106 was designed to test the A-Zone down-plunge, including the down-plunge continuation of the vertical section of grade vectorization. The hole was intended to provide additional information to evaluate the continuity and geometry of mineralization at depth, and strengthen LAURION’s geological understanding of the A-Zone.
LBX26-107 was designed to test the McLeod mineralized horizon while reducing the pierce-point spacing between 2022 drill holes. The hole also provided an opportunity to simultaneously test a chargeability anomaly identified in the 2015 Abitibi geophysical survey, combining tighter drill coverage of the known mineralized horizon with testing of a geophysical target.
Building on the program to date, LAURION increased its planned Phase 1 drilling from 3,865 metres to 5,605 metres across 22 drill holes. The expanded program is being informed by SRK Consulting’s independent structural gap analysis of the A-Zone, which identified five priority target areas where additional drilling may address key gaps in the existing drill database and further strengthen geological understanding. LAURION is using this framework, together with ongoing drill results, to prioritize near-term drilling as it continues to systematically advance the A-Zone toward its potential maiden MRE. Specific targets, sequencing and timing remain subject to, among other things, ongoing results and available financing.
Source: TheNewswire
個別の投資に関する推奨やアドバイスを提供することを意図しておりません。ここで述べられている意見や見解は、あくまでも各記事の個人的見解です。